Feedback

Your Name (required)

Your Email (required)

Subject

Your Message

Search

Our Latest Projects

Its fast and atmospheric.

Detailed Survey of Upper Mudi Hydropower project and feasibility study of Material Ropeway

Detailed Survey of Upper Mudi Hydropower project and feasibility

Feasibility study and cost estimate of Makari Gad Hydropower project

Makari Gad Material Ropeway

Makari Gad Material ropeway for the transportation of Construction

Cable car to be built along Sedibagar-Sarangkot hub

Cable car to be built along Sedibagar-Sarangkot hub

Annapurna Cable Car Pvt Ltd is all set to

News and Events

Career Opportunity for Civil Engineer/Overseer

Career Opportunity for Civil Engineer/Overseer

Ropeway Nepal Pvt. Ltd. Is the leading company for the planning, survey, design, supervision

कार्यविधि स्वीकृत नहुँदा डेड दर्जन केबलकारको अनुमति प्रभावित

केबलकार सञ्चालन स्थानीय तहमा दिँदै सरकार

मुलुक संघीय संरचनामा गइसकेको छ । संघीयतामा गइसकेपछि धेरै अधिकार स्थानीय तहमा हस्तान्तरण गर्नुपर्ने

B_Id_451729

Darjeeling ropeway restarts services after seven months

The Darjeeling Rangeet Valley (DRV) passenger ropeway service at Singamari, one of the major

बुटवलको फुलवारी उत्तरपट्टिको देउरालीबाट पाल्पाको नुवाकोट गढीसम्म केवलकार सञ्चालन हुने भएको छ ।

बुटवलमा केवलकार सञ्चालनको तयारी

बुटवलको फुलवारी उत्तरपट्टिको देउरालीबाट पाल्पाको नुवाकोट गढीसम्म केवलकार सञ्चालन हुने भएको छ । करिब